SVTU-10M heat meters at MTM Concern provide stable heat metering.
We are pleased to announce that our SVTU-10M heat meters have been installed at the MTM concern for accurate heat metering. This is an important step in preparing for the next heating season, as modern devices allow for effective control of heat consumption at infrastructure facilities.
Zavodskiy district branch of the City Heating Networks concern provides heat to about 600 consumers, including high-rise and low-rise residential buildings, private homes and social institutions. The heating season in the district is running as planned, ensuring that all residents receive the necessary heat. The district's largest boiler house, which operates 5 boilers, currently operates two main boilers, while the rest are in reserve. During the off-heating period, comprehensive capital works were carried out: almost 2,000 meters of heating mains were replaced on the even-numbered side of Demokratichna Street, 15 valves were installed and more than 1,000 meters of pipelines were insulated. At the boiler house itself, they carried out preventive maintenance of the equipment, checked and, if necessary, replaced valves and large gate valves on the network pumps. According to Alexander Dyumin, chief engineer of the MTM Group's Zavodskoye District Branch, these works guarantee a stable and uninterrupted supply of heat to consumers.
These measures, along with the installation of our modern heat meters, are evidence of a systematic approach to modernizing the heat supply infrastructure, which ensures reliable heating even in difficult conditions.